Canadian Biomass - June 2016

Final Thoughts

Bruno Zrno 2016-06-07 23:54:39

Red Tape Challenge

How red tape is hurting biomass development in Ontario

In early May, I participated in the Red Tape Challenge (RTC) roundtable discussion in Cambridge, Ontario.

The Red Tape Challenge, launched by the Ministry of Economic Development, Employment and Infrastructure (MEDEI), is “an online consultation tool designed to identify and eliminate duplication, lessen compliance burdens, shorten response times and make it easier for businesses to interact with government.” (www.ontario.ca/page/red-tape-challenge)

The first phase focus of the RTC is consulting on automotive parts manufacturing sector regulations. Since one of the categories is Environmental Regulations, with subcategories such as Rules of Boiler Use and Environmental Approvals Process, I was able to address the obstacles facing the wood biomass industry in Ontario.

The main provincial legislation governing the discharge of pollutants in Ontario is the Environmental Protection Act. As per this Act, the Ministry of Environment and Climate Change (MOECC) requires that an Environmental Compliance Approval (ECA) must be obtained for all wood burning equipment. That means that in the same “basket” we have outdoor stoves, custom made furnaces-boilers and modern certified biomass boilers.

It is understandable that first time installed certified equipment goes through the testing process. Also, it is understandable and desirable that custom made, un-certified equipment goes through that process every time. The “problem” with the current Act and costly ECA approval is that you have to test the same-identical, certified equipment for every single project, every single time.

When we talk about the modern biomass boilers, we are referring to proven, high-efficient and fully automatic multistage combustion technology with oxygen, temperature and pressure sensors controlled by a complex PLC system. These boilers are manufactured and certified to meet all North American and European industry, safety and environmental standards. Modern biomass boilers meet all CSA and TSSA standards.

For modern biomass boilers, current standards require ECAs for identical certified boilers burning identical certified fuels every single time. There are three issues that immediately emerge:

1. What is the reason for constant carbon monoxide monitoring of flue emissions if the equipment is tested during the certification process and if testing is performed during commissioning?

If changes are made to the equipment, then we are not talking about the certified equipment anymore. Furthermore, the use of uncertified fuel and/or any modifications to the product post-certification would void the warranty.

2. What is the reason for acoustic assessment of certified equipment, in cases where a sound testing report is available and performed by third party companies?

For all standard equipment in HVAC industry, sound power and/or sound pressure results are sufficient proof for acoustic performance.

3. What is the reason for air dispersion modelling if you have a requirement for emission limits and fuel standards, plus a venting system designed according to standards?

Fossil fuel boilers have fuel standards and boiler performance reports with appropriate fuels with no requirement for dispersion modelling. But if a user burns a waste oil with boiler certified for standard oil, emission levels will be way out.

Just as regulatory bodies and industry in general trust that users will use a standard fuel for fossil fuel boilers or that drivers will not use a cooking oil for diesel motors, the same trust should be considered with certified wood biomass boiler users. The point that I am trying to make is that equipment will give the output according to the fuel being used.

And if anyone ever wondered why Ontario is so behind in wood biomass industry compared to B.C., Quebec, NWT or Maritime provinces, the answer lays in the very costly environmental approval process. While the wood biomass industry in other provinces has modern standards that support the industry (especially local wood industry and forestry), Ontario is significantly behind. While other provinces see multiple installations of modern wood biomass systems every year (in schools, universities, hospitals and condo buildings in downtown cores etc.), Ontario is still living in the perception of wood biomass technology as an old stove with black smoke spewing out of the chimney.

Ontario recently launched a Climate Change Mitigation and Low Carbon Economy Act with the plan of creating a low-carbon economy through a cap and trade system. With wood biomass being recognized as carbon neutral fuel, the plan should focus on change and modernization of the bio-industry standards.

©Annex Biomass_CFI_OF. View All Articles.

Final Thoughts
https://magazine.canadianbiomassmagazine.ca/article/Final+Thoughts/2505110/309001/article.html

Menu
  • Page View
  • Contents View
  • Advertisers

Issue List

Summer 2025

Spring 2025

Winter 2025

Fall 2024

Summer 2024

Spring 2024

Winter 2024

Fall 2023

Summer 2023

Spring 2023

Winter 2023

Fall 2022

Summer 2022

Spring 2022

Winter 2022

Fall 2021

Summer 2021

Spring 2021

Winter 2021

Fall 2020

Summer 2020

Spring 2020

Winter 2020

Fall 2019

Summer 2019

Spring 2019

Winter 2019

September-October 2018

JulyAugust 2018

MayJune 2018

March April 2018

January-February 2018

November/December 2017

September/October 2017

July/August 2017

May-June 2017

March-April 2017

January February 2017

November December 2016

October 2016

July August 2016

June 2016

March April 2016

January February 2016

November/December 2015

September/October 2015

July August 2015

May-June 2015

March-April 2015

January-February 2015

November - December 2014

September October 2014

Intersaw Guide 2014

July August 2014

May June 2014

March/April 2014

January/February 2014

November/December 2013

September/October 2013

August/September 2013

May/June 2013

March/April 2013

January/February 2013

November/December 2012

September/October 2012

July/August 2012

May/June 2012

March/April 2012

January/February 2012

November/December 2011

September/October 2011

July/August 2011

May/June 2011

April 2011

January/February 2011

November/December 2010

September/October 2010

July/August 2010

May/June 2010

March/April 2010

January/February 2010

November/December 2009

September/October 2009

August 2009

June 2009

March 2009

December 2008

August 08


Library